FPSO Repair – Berge Helene

Prefabrication and installation of various steel stiffeners. Work stages:

  • prefabrication of steel sections at Navikon premises,
  • delivery of steel materials, welding equipment / consumables, PPE to Mauretania,
  • installation works performed onboard during vessel operation,
  • steel renewal of longitudinals, bulkheads and stiffeners,
  • fabrication and coating of pipe spools for PWT 3S produced water line,
  • HDG of fabricated pipe spools, pressure test of butt welded pipe sections,
  • renewal of COW line spool piece,
  • steel outfitting works boat decks, railings; renewal of pipe lines.